Complete your request and calculate the cost of a specific service invoiced by Enagás Transporte (the results are for information purposes only and are not binding).
Enagás Transporte S.A.U. makes this tool available to its customers to facilitate the calculation of the cost of the services offered. The simulator has been updated for the 2025 gas year and incorporates the tolls laid down in the Resolution of May 23, 2024, of the National Markets and Competition Commission, setting the tolls for access to transmission networks, local networks and regasification for the 2025 gas year.
The simulator complies with the REMIT requirement (Regulation (EU) No. 715/2009, Annex I, Section 3.4), which requires transmission system operators to publish their tariffs.
The tool is provided for information purposes only and should in no way be construed as binding in relation to the invoicing resulting from the contracting of services. The actual invoicing amount may differ, as certain billing elements have been omitted or simplified for ease of use.
For each service, the user should enter the basic billing parameters for ATR services, such as the contracted capacity, the duration of the contracted product or the volume used. In addition to the invoiced amount, additional relevant information is provided for each service, which will appear after entering the service parameters.
For services not associated with slots, the simulator provides the monthly billing amount. For example, for annual, quarterly and monthly products, the simulator calculates the invoice the customer would receive in a standard 30-day month.
entrada-PVB
Entry to virtual balancing point (VBP)
The access to the Virtual Balancing Point service includes the right to use the facilities necessary for transporting gas from the point of entry to the transmission network up to the Virtual Balancing Point
Peaje aplicable a entradas por ##-puntoEntradaEntradaPVB-##
Capacity term (CT): ##-terminoCapacidadEntradaPVB-## €/(kWh/day)/year
Variable term (VT): 0.000137 €/kWh
Multipliers applied to products with a duration of less than one year:
Product | Multiplier |
---|---|
Quarterly | 1.1 |
Monthly | 1.2 |
Daily | 1.6 |
Within day | 5.6 |
Other associated costs:
Applied to total invoiced tolls
GTS fee: ##-cuotaGTSvar-##%
CNMC fee: ##-tasaCNMCvar-##%
Additional notes:
salida-PVB
Exit from the VBP
The exit from the Virtual Balancing Point service includes the right to use the facilities necessary for the transfer of gas from the Virtual Balancing Point to an exit point of the transmission network, except for regasification plants.
Peaje aplicable a salidas por ##-puntoSalidaSalidaPVB-##
Capacity term (CT): ##-terminoCapacidadSalidaPVB-## €/(kWh/day)/year
Variable term (VT): 0.000137 €/kWh
Multipliers applied to products with a duration of less than one year:
Product | Multiplier |
---|---|
Quarterly | 1.2 |
Monthly | 1.3 |
Daily | 1.6 |
Within day | 3.4 |
Other associated costs:
Applied to total invoiced tolls
GTS fee: ##-cuotaGTSvar-##%
CNMC fee: ##-tasaCNMCvar-##%
Additional notes:
salida-PVB-consumidor
Exit from the VBP to a consumer
The exit from the consumer service includes the right to use the facilities necessary for the transfer of gas from the Virtual Balancing Point to an end consumer or, where applicable, to the point of connection of a direct line to a consumer.
Toll applied to national exits from the transmission network:
Capacity term (CT): 0.091544 €/(kWh/day)/year
Variable term (VT): 0.000137 €/kWh
Peaje de acceso a redes locales en nivel tarifario ##-grupoTarifarioSalidaPVBconsumidor-##:
Capacity term (CT): ##-terminoCapacidadSalidaPVBconsumidor-## €/(kWh/day)/year
Variable term (VT): ##-terminoVariableSalidaPVBconsumidor-## €/kWh
Peajes asociados a la recuperación de otros costes de regasificación (OCR) en nivel tarifario ##-grupoTarifarioSalidaPVBconsumidor-##:
OCR Toll: ##-peajeOCRSalidaPVBconsumidor-## €/(Kwh/day)/year
The multiplier applied to products with a duration of less than one year depends on the month of consumption (Section 1.4 of Annex I of the CNMC Resolution of 23 May 2024).
Para el producto y mes seleccionados, se aplica el siguiente multiplicador: ##-multiplicadorSalidaPVBconsumidor-##
Other associated costs:
Cargo unitario en nivel tarifario ##-grupoTarifarioSalidaPVBconsumidor-##: ##-cargoUnitarioSalidaPVBconsumidor-## €/(kWh/day)/year
GTS fee (*): ##-cuotaGTSvar-##%
CNMC fee (**): ##-tasaCNMCvar-##%
(*) Applied to tolls and fees (CNMC Resolution of 17 December 2021)
(**) Applied to the sum of tolls, fees and charges (CNMC TED Order/1023/2021 of 27 September 2021)
Additional notes:
facturacion-exceso-capacidad
Billing for excess capacity
For each gas day in which the maximum flow demanded by a consumer is greater than the sum of the contracted capacities in each of the contracts that the user may have, the excess will be billed by multiplying the excess capacity by 3 times the capacity term corresponding to a daily product, both in the case of transmission network exit tolls and local network access tolls.
Toll applied to national exits from the transmission network:
Capacity term (CT): 0.139674 €/(kWh/day)/year
Peaje de acceso a redes locales en nivel tarifario ##-grupoTarifarioFacturacionExceso-##:
Capacity term (CT): ##-terminoCapacidadFacturacionExceso-## €/(kWh/day)/year
The multiplier applied to products with a duration of less than one year depends on the month of consumption (Section 1.4 of Annex I of the CNMC Resolution of 23 May 2024).
Para el producto y mes seleccionados, se aplica el siguiente multiplicador: ##-multiplicadorFacturacionExceso-##
Other associated costs:
GTS fee (*): ##-cuotaGTSvar-##%
CNMC fee (**): ##-tasaCNMCvar-##%
(*) Applied to tolls and fees (CNMC Resolution of 17 December 2021)
(**) Applied to the sum of tolls, fees and charges (CNMC TED Order/1023/2021 of 27 September 2021)
Additional notes:
descarga-buques
Vessel unloading
The vessel unloading service includes the right to use the facilities necessary for the unloading of LNG from a tanker at a regasification plant.
Vessel unloading service tolls:
Variable term (VT): 8.00 €/GWh
Fixed term (FT): See table below.
Type of vessel | FT (€/operation) |
S | 4,355 |
M | 4,355 |
L | 5,165 |
XL | 5,333 |
XXL | 5,622 |
Other associated costs:
Applied to total invoiced tolls
GTS fee: ##-cuotaGTSvar-##%
CNMC fee: ##-tasaCNMCvar-##%
Additional notes:
Type of vessel | Size [m3 GNL] | Size (*) [GWh] |
S | ≤ 40,000 | ≤ 272 |
M | 40,000 < Vol ≤ 75,000 | 272 < Vol ≤ 510 |
L | 75,000 < Vol ≤ 150,000 | 510 < Vol ≤ 1,021 |
XL | 150,000 < Vol ≤ 216,000 | 1,021 < Vol ≤ 1,470 |
XXL | Vol > 216,000 | Vol > 1,470 |
* La energía equivalente se da a nivel informativo, utilizando la conversación aprobada en regulación. La conversión real dependerá de las características reales del gas transportado.
recarga-buques
LNG terminal to vessel
The LNG terminal to vessel loading service includes the right to use the facilities necessary for the loading of LNG onto a tanker at a regasification plant.
Tanker reloading service toll
Variable term (VT): Plant to ship, 13 (€/GWh)
Other associated costs:
Applied to total invoiced tolls
GTS fee: ##-cuotaGTSvar-##%
CNMC fee: ##-tasaCNMCvar-##%
Additional notes:
puesta-frio
Cooling down
The tanker cooling-down service includes the right to use the facilities necessary for purging the inert gas out of the tanker (gassing up) so that it can receive LNG from liquefaction or regasification plants, following the appropriate safety standards. The volume of cargo associated with the cooling-down service shall not exceed the tanker’s heel level.
Cooling-down service toll:
Variable term (VT): 590 €/GWh
Other associated costs:
Applied to total invoiced tolls
GTS fee: ##-cuotaGTSvar-##%
CNMC fee: ##-tasaCNMCvar-##%
Additional notes:
carga-cisternas
Truck loading
The truck loading service includes the right to use the facilities necessary for loading LNG onto tanker trucks at a regasification plant.
Truck loading service tolls:
Capacity term (CT): 0.022806 €/(kWh/day)/year
Variable term (VT): 0.000331 €/kWh
Tolls associated with the recovery of other regasification costs (ORC)
ORC Toll 0.000122 €/kWh
Multipliers applied to products with a duration of less than one year:
Product | Multiplier |
---|---|
Quarterly | 1.1 |
Monthly | 1.2 |
Daily | 1.7 |
Within day | 6.7 |
Other associated costs:
Unit charge 0.006543 €/(kWh/day)/year
GTS fee: ##-cuotaGTSvar-##%
CNMC fee: ##-tasaCNMCvar-##%
(*) Applied to tolls and fees (CNMC Resolution of 17 December 2021)
(**) Applied to the sum of tolls, fees and charges (CNMC TED Order/1023/2021 of 27 September 2021)
Additional notes:
1.526
0.14
Complete your request and calculate the cost of a specific service invoiced by Enagás Transporte (the results are for information purposes only and are not binding).
Cost
0 €
Services list
Highlighted info for this service
/