Enagás, as a gas transmission sytem operator, is committed to publishing on the corporate website all the information required in Regulation (EC) No 1775/2005, annex I.
ENTSOG and its members, which include Enagás, have designed the following transparency template including all the information required by the european Regulation, in order to facilitate easier access to gas transmission system.
Description | Links |
---|---|
3.1.2 a) A detailed and comprehensive description of the different services and their charges | Services offered |
Our transmission network | |
Tariffs, tolls and fees for logistic services and Entry/Exit to/From VBP | |
Tariffs, tolls and fees for national non-localised services | |
3.1.2 b) u. c) 1. Different transportation contracts and other significant document | Authorization Spanish Gas System: Balancing portfolio Agreement Resolution Document of adhesion to the framework agreement for access to Spanish gas system facilities |
Connections to our transmission network | |
3.1.2 c) Network code / standard conditions | Technical Management of the Gas System Regulations and detailed protocols |
3.1.2 c) 2. Specification of relevant gas quality parameters | Gas quality |
Gas quality specifications | |
3.1.2 c) 3. Pressure requirements | N/A |
3.1.2 c) 4. Procedure in the event of an interruption of interruptible capacity | Interruptibily of intra-European connections |
Resolution interruptible capacity allocation conditions | |
3.1.2 d) Harmonised procedures applied when using the transmission system, including the definition of key terms | NGTS and Protocols |
Procedures and protocols | |
3.1.2 e) Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures | |
Coordinated offer and allocation of capacity in European International Connections | |
3.1.2 f) Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator | Secondary capacity market in intra-European connections |
Secondary market Spanish Gas System | |
3.1.2 g) Rules on balancing and methodology for the calculation of imbalance charges | Transmission network balancing rules |
Methodology for calculating daily imbalance tariffs | |
3.1.2. h) Flexibility and tolerance levels included in transportation and with additional charges | |
3.1.2 i) Detailed description of the gas system of TSO and its relevant points of interconnection / names of the operators of the interconnected systems or facilities | Map of Enagás Transporte infrastructures |
Enagás transmission network | |
Relevant points list | |
3.1.2 j) Rules applicable for connection to the system | RD 1434/2002 |
Connections to end consumers (PCLD) | |
Connections to transmission network (PCTT) | |
Connections to distribution network (PCTD) | |
Renewable gases connections to network (Green Link) | |
3.1.2 k) Information on emergency mechanisms | NGTS-11 |
Operation notes | |
Infrastructure incidents (Enagás) | |
3.1.2 l) Procedures agreed at interconnection points (if relevant) relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing | |
3.1.2 m) Description of the methodology and process used to calculate the technical capacity | |
3.3. (4), (5) Capacities, nominations and renominations, actual physical flows, gross calorific values | Permissible ranges |
Capacities in the transmisión network | |
System Operation Plan | |
GCV | |
3.3. (1) f) Planned and actual interruptions | Infrastructure incidents |
Operation notes | |
3.3. (1) g) Planned and unscheduled interruptions | Enagás Infrastructure Maintenance Plan |
Annual System Maintenance | |
Infrastructure Unavaiability (UMM Entsog) | |
3.4 (1) u. (2) Information on secondary trading | Secondary capacity market in intra-European connections |
Secondary market Spanish Gas System | |
3.4 (3) Balancing services | Gas markets |
3.4 (4) Further flexibility service of TSO; here OFC | N/A |
3.4 (5) Amount of gas in the transmission system and the forecast | Physical status of the System |
3.4 (6) User-friendly instruments for calculating tariffs | Tariffs simulator |